Description:

Resulting in substantially lower construction costs and an accelerated construction schedule, the Baldwin Bridge in Old Saybrook/Old Lyme, Connecticut, is a tangible product of innovation in precast concrete segmental bridge design and construction techniques. Utilizing cross sections that are among the heaviest and widest used in the country for cantilever construction, the bridge was completed eight months ahead of schedule and was bid at $6.1 million less than its closest steel alternative.
By utilizing a car barge system designed to extend three quarters of the way across the river, work continued throughout the harsh winter, when movement through the river ice flows would otherwise have been impossible. The barges, decked with concrete, made a floating roadway that provided access to pier concrete work. This method enabled work to continue on six piers at a time. The bridge is composed of 488 unique precast segments, each weighing almost 150 tons. Only eight different cross-section designs were required. The large number of segments reduced form work costs and allowed speedy erection. Precasting during the cold winter months further compressed the construction schedule and improved quality control. The huge segments, cast at a rate of better than one segment per day, were made at a nearby casting yard created especially for this project and provided the contractor with tighter control over materials production and delivery.
The segments were then erected with a specially designed 430 foot long, 600 ton overhead gantry enabling bridge erection to take place from above with minimal impact on the river. This saved time since it alleviated the need for working with cumbersome cranes, barges and tugboats. The bridge was opened to traffic on May 25, 1993.

Related Standards:

 

Contact Person:

Chris Reseigh

Organization:

Parsons Brinkerhoff Construction Services

Address:

465 Spring Park Place

 

 

City:

Herndon

State/Province:

VA

Postal Code:

22070

Country:

USA 

Phone No.:

703-742-5700

FAX:

703-742-5800

URL:

http://www.pbworld.com

Email

 

:

 

 

Search for another NOVA Nomination

Home | Site Map | Search | NOVA Award | Innovations | Banquet | Sponsors | Golf Outing | About CIF | Previous NOVA Winners | Nomination Database | NOVA Award Process | Tell Us About an Innovation | Scholars Program | Mock Jury | CIF Members | CIF News | Links with other Sites

NOVA Nomination Form | CIF Membership Form | Ticket Order Form | More Info

Copyright © 2004, The Construction Innovation Forum
7001 Haggerty Road
Canton, Michigan, U.S.A. 48187
Phone: (734) 455-0600
Fax: (734) 455-3131
E-Mail: info@cif.org
Web Site: www.cif.org

This page last updated 05/15/02 by RICarr